In Swathi Build Tech PEB systems, the complete steel building package is delivered to site as a fully finished product. This includes the primary members, secondary members, cladding system, building accessories and other components. Site erection is fast and simple as all the building components are fixed through nut and bolt connection as per the erection drawings. No site fabrication or welding is involved which results in significant savings in construction time and superior quality when compared to conventional steel construction. The PEB system is highly efficient in design due to synergy between building components. Primary members are made of tapered, built-up sections and secondary members from cold- rolled sections made of high-strength steel. High- strength steel is used. All structural elements are fully optimized by the proprietary computerized design program and hence there is a significant reduction in dead load reactions to the foundations.